Defence

difesa
  • DIFESA
    • Florence
    • Livorno
    • Pisa
    • Baiano di Spoleto - Perugia

7th INFRASTRUCTUE DIVSION

Municipality: Florence
Substitution of electrical transformer substation at Palazzo S.Caterina

7th MILITARY ENGINEERING DIRECTORATE

Municipality: Livorno - Pisa
Standard maintenance work on general electrical systems at Rugiadi and Gamerra Barracks.

7th MILITARY ENGINEERING DIRECTORATE

Municipality: Livorno
Ensuring regulatory compliance of the electrical system at the RCST department workshop at Pisacane Barracks.

7th MILITARY ENGINEERING DIRECTORATE

Municipality: Baiano di Spoleto - Perugia
Implementation of perimeter lighting system at the Terrestre Munitions military depot.

7th MILITARY ENGINEERING DIRECTORATE

Municipality: Livorno
Ensuring regulatory compliance and restoration of the building's electrical system, MV/LV substation and perimeter lighting at the Vannucci, Pisacane and Lustrissimi barracks.

CEV srl

Municipality: Florence
Work to reconstruct the electrical systems of units 1 and 19 of the MILITARY PHARMECEUTICAL buildings at Guareschi barracks.

7th MILITARY ENGINEERING DIRECTORATE

Municipality: Livorno
Work to clear the airspace with reconstruction of the perimeter lighting power lines and telephone lines at the Gongaza barracks.